Your settings for cookies and pixels on https://pl.rwe.com

Select which cookies and pixels we are allowed to use. Please note that some cookies are necessary for technical reasons and must be enabled in order to maintain the functionality of our website. If you would like to benefit from every service on our website, please consider that you need to choose every cookie category. For more information, please refer to our Data Protection Information.

    • Maintain the stability of the website.
    • Save your log-in data.
    • Allow to improve the user experience.
    • Provide visual information on locations.
    • Provide visually prepared information on contents/statistics.

You can change your cookie and pixel settings on https://pl.rwe.com at any time via our Data Protection Information.

Imprint


Show Details
Select all Confirm selection

Offshore Wind Farm Sharco Duo

RWE on the path towards energy transition in Poland

For many years, RWE has been driving forward the Polish energy transition by developing, building and operating onshore and offshore wind farms.

Currently developed project named Sharco Duo constitutes a significant step of this transition. Submitted bid for Sharco Duo envisages an up to 1.8-gigawatts (GW) offshore wind farm, located in the direct neighborhood to its F.E.W. Baltic II project.

The project is located in the 44.E.1 area, north-west of the Słupsk Bank in the central Polish Baltic Sea.

Location

Sharco Duo | Location

Click on the image to zoom


Unique design concept of state-of-the-art offshore wind technology

RWE’s unique design concept for Sharco Duo consists of state-of-the-art offshore wind technology combined with innovative solutions to build and operate the wind farm in harmony with the Baltic Sea ecosystem and to perfectly match the demands of the Polish energy system and reach full grid stability.

Thanks to RWE's extensive involvement in the central Polish Baltic sea and the synergies with its F.E.W. Baltic II project, RWE is in full readiness to develop and realise the Sharco Duo offshore wind farm immediately and produce the first electricity as early as 2028.

RWE Image RWE Image

Facts and figures

Up to 00 GW

Installed capacity

00 km²

Site size

00 km

Distance to the shoreline

00 million

Poles supplied per year with green energy

as early as 00

Full readiness to produce green electricity

00 m

Average depth below sea level

Applicant: RWE Group via Carmagnola sp. z o.o.

Benefits

Sharco Duo project envisages

  • state-of-the-art offshore wind technologies

  • green hydrogen production at sea and onshore

  • innovative electricity storage solutions

  • extensive synergies with F.E.W. Baltic II project and operational base in Ustka

  • enhanced biodiversity and offshore wind eco-innovations

  • scientific research, knowledge sharing and education

  • a low-emissions operating strategy

  • continuing strong contribution to local economy


Timeline

Sharco Duo | Project timeline

Click on the image to zoom


Sharco Duo - a new generation of offshore wind energy

RWE is expecting extensive synergies with its F.E.W. Baltic II project and operational base in Ustka during the development, construction and operation of Sharco Duo. So the company will be able to provide Poland with green and low-cost electricity.

RWE Image
RWE Image
RWE Image
RWE Image
RWE Image
RWE Image
RWE Image
RWE Image
RWE Image
RWE Image
RWE Image

Cooperation with the academia

In addition, we will foster local research and share the knowledge gained about innovative technologies widely.

University of Gdańsk
Gdynia Maritime University 
Maritime University of Szczecin 
Institute of Oceanology, Polish Academy of Sciences 

RWE has submitted bids for the following capacities:

Freeboard I (1.5 GW)
Freeboard IV (0.9 GW)
Freeboard V (1.9 GW)
Xlokk II (1.7 GW)

Submitted RWE bids | Locations

Click on the image to zoom